FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD

Manufacturer from China
Active Member
7 Years
Home / Products / Climbing Formwork System /

Safety Light Weight Climbing Scaffold System High Capacity For LNG Projects

Contact Now
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Country/Region:china
Contact Person:MissLiu
Contact Now

Safety Light Weight Climbing Scaffold System High Capacity For LNG Projects

Ask Latest Price
Video Channel
Brand Name :Forpro
Model Number :Simple climbing formwork F16 system
Certification :ISO and CE
Place of Origin :shanghai
MOQ :100 pcs
Payment Terms :L/C, T/T, Western Union
Supply Ability :100000 Pcs / year
Delivery Time :30-45 work days
Packaging Details :Pallet
Material :Q235 Steel, timber beam,Plywood
Color :Silver, hot-galvanize brown, light yellow
Size :45KN per bracket
Application :Silo, NPP projects, LNG Tank, shiplock, high piers
Product name :Simple Light weight climbing formwork F16 system
Type :Climbing formwork,Wall Formwork, Steel formwork,Column formwork,Climbing formwork
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Simple Light-Weight Climbing Formwork System F16 for LNG Projects

Description

Climbing formwork F16 is a very simple and low weightest climbing formwork system, It is widely utilized in various projects like LNG tank, Nuclear power plant project, silo project and high piers etc. With only 3 main components, the F16 climbing formwork is assemled quickly.

As a kind of low weight formwork system, Lower capacity crane could be equipped on the jobsite to lift the formwork unit and other jobs. Thank for scissor spindle, 1.60m wide platform can provide title back 700mm space for formwork unit and provide enough space for formwork cleaning and reinforcement installation. 3 levels of platforms are designed to provide orient work space for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. Simple system means easy operation and easy material management and reduce labour costs and storage costs.

Components
• Big dimension
formwork with timber beam H20 and plywood and steel waler

• Triangle light weight climbing brackets F16

• Sissor action spindel to trave formwork panel of 700mm distance

• Economic 1.60m width of main platform

Features
• Economical main Platform is 1.60 wide for safe operation

• Scissor action spindle can move formwork away 700mm from concrete surface

• 3 levels of platform provide orient operation space

• High capacity of 45KN verticle load per bracket and bracket

Climbing Formwork Installation Process

Safety Light Weight Climbing Scaffold System High Capacity For LNG Projects

Applications Field

• Liquid nature gas tank

• Industrial shearing wall

• Piers

• Nuclear power plant projects

• Silo projects

Safety Light Weight Climbing Scaffold System High Capacity For LNG Projects

Forpro Service


1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.

3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.

4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.

Inquiry Cart 0