FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD

Manufacturer from China
Active Member
6 Years
Home / Products / Climbing Formwork System /

2.40m Wide Platform Hot Galvanizing Climbing Formwork System With Automatic Hydraulic System

Contact Now
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Country/Region:china
Contact Person:MissLiu
Contact Now

2.40m Wide Platform Hot Galvanizing Climbing Formwork System With Automatic Hydraulic System

Ask Latest Price
Video Channel
Brand Name :Forpro
Model Number :Modular climbing formwork system
Certification :SGS,ISO,CE
Place of Origin :shanghai
MOQ :20 pcs
Payment Terms :L/C, T/T
Supply Ability :1000 Pcs / year
Delivery Time :30-45 work days
Packaging Details :Pallet
Material :Q235 Steel, timber beam,Plywood
Color :Blue, yellow
Size :50KN per bracket
Application :High verticle structure, shiplock, pylon legs, high piers
Product name :climbing formwork CF240 system
Type :Wall Formwork, Steel formwork,Column formwork,Climbing formwork
Name :Concorete Formwork,formwork system for High buidling/Bridges/dam/pier/tunnel/workshop
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Hot Galvanizing Climbing Formwork System Main Platform 2.4m Wide

Description

As a high load bearing capacity, climbing formwork can be widely utilized in various projects as high piers, abutment, elevator testing tower and high-rise structures. it is designed for precise and convienient operation for all high-rise projects, 2.40m wide platform in comibination movable formwork unit ensure speedy and safe formwork operation. Multi level platforms provide orient work space for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination.

Safety
The embedded system uses special high-specification embedded parts.
The main general steel components are made of hot-dip zinc.
Platforms at all levels and external protection adopt rigid protection technology.


Efficient
One layer every 4-5 days, you can reach any height you want and the surface quality is high.


economic
The use of external power to upgrade and the use of a three-tier platform has greatly reduced costs.


Beautiful
For your project's own professional template scheme, standard products and standard colors, you can be impeccable in the visual impact of technical solutions and product use.


Diverse product choices
You can choose the appropriate plywood according to the number of turnovers.
Platform plates (wood products, steel springboards, shaped steel plates) can be selected according to construction requirements.
According to the construction requirements, you can choose the enclosure material (custom punched steel plate, dense mesh).

Climbing Formwork Installation Process

2.40m Wide Platform Hot Galvanizing Climbing Formwork System With Automatic Hydraulic System

Applications Field

2.40m Wide Platform Hot Galvanizing Climbing Formwork System With Automatic Hydraulic System

2.40m Wide Platform Hot Galvanizing Climbing Formwork System With Automatic Hydraulic System

Forpro Service

Provide support in every stage of projects
1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.

3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.

4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.

Inquiry Cart 0