FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD

Manufacturer from China
Active Member
7 Years
Home / Products / Climbing Formwork System /

High Load Bearing Climbing Formwork System For Dam And Bridge Abutment Construction

Contact Now
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Country/Region:china
Contact Person:MissLiu
Contact Now

High Load Bearing Climbing Formwork System For Dam And Bridge Abutment Construction

Ask Latest Price
Brand Name :Forpro
Model Number :Heavy duty climbing formwork system
Certification :ISO and CE
Place of Origin :shanghai
MOQ :60 pcs
Payment Terms :L/C, T/T
Supply Ability :10000 Pcs / year
Delivery Time :30-45 work days
Packaging Details :Pallet
Material :Q235 Steel, bended profile,steel panel
Color :Blue lacquer, brown, light yellow
Size :220KN per bracket
Application :massive concrete, dam, power station, shiplock, bridge abutment
Product name :Dam climbing formwork DF220 system
Type :Wall Formwork, Steel formwork,Column formwork,Climbing formwork
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Dam Climbing Formwork for Dam and Bridge Abutment Construction Speedy

Description

As a high load bearing capacity and safety climbing formwork, Dam formwork D20 is widely utilized in various massive concrete projects as dam, abutment, coffer dam, shiplock and power station house projects. it is specially designed for projects where through-in tie rod could not be applied to fix opposite formwork, and all concrete pressure will be beared by climbing brackets. 1.70m wide platform in comibination with title back formwork unit ensure speedy and safe operation. Multi level platforms provide orient work space for formwork operation, concrete pouring and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination within 300.

Elements
• Title back formwork unit could be timber beam large size formwork or steel formwork

• Triangle brackets bearing concrete pressure

• Panel travelling unit is option if reinforcement installation space is required

• Anchoring system 20.0 with high loadability

Features
•Main pPlatform is 1.70 m wide for safe operation

• Formwork is title back or 600mm retraction space is also possible

• 3 levels of platform provide space for concrete pouring, formwork operation and concrete surface repairing

• Max. permitted pull force is 200kN per bracket for embedded tie rod

Climbing Formwork Installation Process

High Load Bearing Climbing Formwork System For Dam And Bridge Abutment Construction

Packing

High Load Bearing Climbing Formwork System For Dam And Bridge Abutment Construction

Applications Field

High Load Bearing Climbing Formwork System For Dam And Bridge Abutment Construction

FAQ
Q 1, Are you a factory or a trading company?
Yes,We are professional factory.

Q 2.Do you have strong techinicans teams?
Yes,We have 23 technical engineers with more than 20 years experience

Q 3. Do you accept OEM services?
Yes, we could make the customized products according to your drawings.

Q 4. What is your production capacity?
3000Tons per month.

Q 5. Do you have test report?
Yes, we have done many test by TUV Rheinland(Shanghai) Co.,Ltd.

Q 6. How long is your delivery.
Usually 20-25days after deposit confirmed.

Inquiry Cart 0