Massive Concrete Project To Be Built With Dam Climbing Formwork DF220
Description
For RCC dam projects and other massive concrete projects like dam, abutment, coffer dam, shiplock and power station house projects, the formwork could only be erected from one side,and through-in tie rod could not be applied to fix opposite formwork, all concrete pressure will be taken by climbing brackets. As a high load bearing capacity and safety climbing formwork, Dam formwork DF220 is the best option to applied in this kind of project. 3 levels of platforms provide orient work space for formwork operation, concrete pouring and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination within 300.
Conponents
• Large size steel panel or steel frame panel
• Heavy duty climbing brackets DF220
• Main platform, top plstform and suspension platform
• Climbing cone, high strength screw and snake-like anchor
Features
• Standard ouring height is 3m to 4m
• Max. permissable concrete pressure is 40kN/m2
• Min.concrete strength requirement in anchoring point is 10MPa
• Max. permitted pull force is 220kN per bracket for embedded tie rod
• Main platform width is 1.85m
Steel Panel Dimension Sheet
Product Series | Product Dimension (WxL) | |||||
3.0m | 3.0x2.1 | 3.0x1.5 | 3.0x1.2 | 3.0x0.9 | 3.0x0.6 | 3.0x0.3 |
2.4m | 2.4x2.1 | 2.4x1.5 | 2.4x1.2 | 2.4x0.9 | 2.4x0.6 | 2.4x0.3 |